Emergency Service 24/7715.423.6310
This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting.
$0.0602 per kWh
Charge per kWh varies monthly. (See schedule PCAC.)
Same as Rg-1.
In lieu of metering each type of lamp, arm and fixture unit, the utility may estimate the electrical consumption of a unit type by metering one unit of a lamp size that is on for a similar time period. Each unit of the same size and on-time period shall be billed the same amount of energy as used by the metered unit of its size and on-time period.
A complete set of Authorized Rates and Rules is available at the Utility Office.